What are the 17 key points of pneumatic conveying system design?

Source:http://www.liujianlin.cn/ Release time:2022-02-07 1Second

What are the 17 key points of pneumatic conveying system design?

In the process of designing and conceptualizing a pneumatic conveying system, it is necessary to fully combine and analyze the initial conditions of the design concept, such as material characteristics, basic parameters of conveying conditions, etc., to determine the type of pneumatic conveying system, and to determine the layout of conveying pipelines and their basic elements such as conveying volume, mixing ratio, and airflow velocity. As a highly automated and precisely controlled conveying system, the force conveying system needs to consider multiple key factors comprehensively in the design and implementation process. If one factor is not properly considered, it may lead to low operational efficiency of the entire system, or even the inability to meet process requirements. Next, we will introduce the 17 key points of pneumatic conveying system design with the guidance of environmental protection:

1. The pneumatic conveying system technician also needs to analyze the initial design conditions.

The initial condition includes the material characteristics involved in the pneumatic conveying system, basic parameters of the conveying condition, etc. In addition, flammable and explosive materials require stricter and more careful handling.

2. Determine the type of pneumatic conveying system.

Based on the basic parameters of the initial condition, such as material characteristics, determine whether the conveying type is positive pressure conveying, negative pressure conveying, or mixed conveying.

3. Determine the layout of the conveying pipeline.

At the same time as determining the layout of the conveying pipeline, it is also necessary to determine the structural types of the main components and draw a system layout diagram, avoiding obstacles on site as much as possible according to customer requirements. And it is also necessary to ensure the operation of the pneumatic conveying system.

4. Determine the conveying capacity

Calculate and determine the conveying capacity design of the pneumatic conveying system based on the annual conveying volume, annual operating days, work regularity, and various types of process configurations of the enterprise.

5. Determine the mixture ratio of raw materials and gases.

The material to air ratio refers to the influence of the specific gravity of materials and air during the material transportation process.

6. Determine the airflow velocity for material transportation.

What type of Roots blower, centrifugal blower, or other gas source is needed to affect the airflow velocity!

7. Calculate the amount of air required to be conveyed by the pneumatic conveying system.

8. Calculate the diameter of the conveying pipeline.

Affects the conveying capacity of the pneumatic conveying system

9. Determine the main component structure and relevant specifications of the pneumatic conveying system.

Including: ① the horizontal distance, vertical height, inclination angle, number of bends, pipeline structure, material, and support of the conveying pipeline; ② Types, structures, materials, and quantities of bifurcation pipes and switching valves; ③ The type, specification, material, and nozzle orientation of separators and dust collectors.

10. Calculate the pressure loss of the pneumatic conveying system.

Number of bends and vertical height

11. Select the type and capacity of the pneumatic conveying system fan based on the required conveying air volume, total pressure loss, and related design conditions.

12. Choose the type and capacity of the motor.

13. Determine the required motor equipment and ancillary equipment.

14. Determine the start stop operation sequence, interlock safety devices, and determine the type and capacity of the control panel.

15. Determine the specific location of the suction and exhaust ports, whether to add noise reduction devices, and determine the dust removal measures.

16. Develop installation, debugging and operation procedures.

17. Prepare the types and quantities of vulnerable parts and spare parts required.

Related products / Related products

  • Pneumatic conveying system

    Pneumatic conveying system

  • Pneumatic conveying system

    Pneumatic conveying system

  • Pneumatic conveying system

    Pneumatic conveying system

  • Dust suction truck

    Dust suction truck

2024  Jinan Xinlu Quansheng Machinery Equipment Co., Ltd    

主站蜘蛛池模板: 久久精品亚洲99一区二区 | 手机看片福利国产 | 亚洲视频欧美 | 一二三四观看视频中文在线观看 | 不卡精品国产_亚洲人成在线 | 综合图片小说 | 九色地址| 成人在线网 | 男女午夜爽爽大片免费 | 久久一区二区三区不卡 | 图片小说综合 | 亚洲美女又黄又爽在线观看 | 欧美视频精品在线 | 极品丝袜高跟91极品系列 | 一级做a爰性色毛片免费 | 亚洲黄色在线观看网站 | 亚洲欧洲日韩国产一区二区三区 | 成人无遮挡毛片免费看 | 在线免费福利 | 黄色ab| 91久久九九精品国产综合 | 久久88香港三级台湾三级中文 | 中文字幕一区久久久久 | 日本理论免费高清在线视频 | 波多野结衣免费视频观看 | 一区二区不卡不卡一卡 | 91国内揄拍国内精品对白不卡 | 欧美一级片免费看 | 美女啪啪91| 另类专区国产在线视频 | 国产区成人综合色在线 | 日本一二三四区免费视频 | 国产一区日韩二区欧美三 | 免费xxx视频| 国产国产成人人免费影院 | 一二三四高清在线手机视频 | 亚洲欧美国产精品久久久 | 范冰冰一级做a爰片久久毛片 | 香蕉蕉亚亚洲aav综合 | 在线黄色免费网站 | 波多野结衣久久精品 |